Existing mold
Per model, material and color
The quotation states the minimum for the selected existing tool.
Bakeware
Rectangular pans hold mixtures within a defined base and wall profile. External dimensions determine the space around the pan.
Product overview
Check appliance space and air clearance. Internal portion dimensions and external fit dimensions are separate.

Specifications
Standard range
Choose the listed model or format, then record the finished specification and quantity unit.
| Model / format | Dimensions / contents | Material / assembly | Order unit |
|---|---|---|---|
| Rectangular Silicone Cake & Loaf Molds | Cavity layout, depth and finished dimensions fixed on sample | Silicone; formulation specified for the intended food-contact process | pcs |
Availability, exact material grade and carton packing are recorded in the quotation.
Request pricing for your selected format →Branding & product options
Specify changes to the product, artwork and selling pack separately. Each production route has its own order minimum.
| Option | Availability | MOQ guidance | What to specify |
|---|---|---|---|
| Existing cavity and standard color | Available | Minimum quoted per model / color | Identify the selected sample or model. |
| Color and brand label | Available | Minimum quoted per model / color | Specify color and label position separately. |
| Printed sleeve or color box | Available | Minimum quoted per selling pack | Give molds per selling pack and care text. |
| New cavity, depth or pattern | Development review | Tooling and production minimum quoted | Supply a drawing, 3D file or master sample. |
Approve the product sample, print proof and final packaging specification before bulk production.
Discuss a custom supply project →Order planning
Use these starting quantities to plan your inquiry. Final minimums are confirmed in the quotation for your chosen configuration.
Per model, material and color
The quotation states the minimum for the selected existing tool.
Per pack design
Product and printed-package minimums are separate.
With tooling and production quantity
Approve cavity geometry and process use before order release.
Numeric quantities are planning starting points. The quotation confirms the minimum per model, material, color, artwork and selling pack.
Send your configuration and order quantity →Plan your order
Open the details you need for your buying brief.
Protective bulk packing; individual bags, sleeves or retail boxes specified by selling unit.
Food-contact status: Food-contact suitability and document scope specified for the intended use
Document scope follows the selected materials, intended food-contact use and destination market. Lid, handle, coating and ink requirements are recorded separately.
Share the product reference, quantity and destination.
Review the product configuration and recorded options.
Confirm the sample route or artwork requirements where applicable.
Approve the selected product and packing specification.
Production follows the confirmed order specification.
Arrange packing against the approved product and pack brief.
Shipping details are confirmed after the final product and packaging specification.
Use external length, width and height. Record internal dimensions separately for the baked portion.
Existing mold: Per model, material and color. Branded selling pack: Per pack design. New cavity or structure: With tooling and production quantity. The quotation records the quantity for each selected configuration.
Send the model or drawing, intended use, quantity per configuration, colors, artwork, complete pack contents and destination market.
The document scope follows the selected material, components and intended use. State the destination market and required reports with the order specification.
Request a quote
Tell us the product, estimated quantity, required customization, packaging and destination market.
Build a product range
These items can be discussed together for coordinated color, branding, packaging or consolidated sourcing. Final product combinations and MOQ are confirmed after specification review.